Bump-and-Gen 0
Well, if PECO can call their trash-to-steam plant “trash to cash,” I guess this might be “smash to cash”:
(snip)
The ramps – which cost between £20,000 and £55,000, depending on size – consist of a series of panels set in a pad virtually flush to the road. As the traffic passes over it, the panels go up and down, setting a cog in motion under the road. This then turns a motor, which produces mechanical energy. A steady stream of traffic passing over the bump can generate 10-36kW of power.